What the published cost guides say
We opened two national cost guides for this page on 25 November 2026. One is from a tradesperson directory and one is from a quotes comparison site. Both are third-party ranges written for the whole UK, not for London, and both change without notice, so treat the table as a snapshot and check the pages themselves before relying on any figure. Amounts are written in words, as the guides give them. The sources are listed, with the date read, at the foot of the page.
| Item | Directory cost guide (page marked updated May 2026) | Quotes comparison guide (page marked updated 22 October 2026) |
|---|---|---|
| Whole survey | “Standard leak detection” 80 to 1,600 pounds | Domestic surveys 150 to 750 pounds, complex jobs over 1,000 pounds, a headline average of 500 pounds |
| Survey with a written report | Not given separately | 250 to 750 pounds |
| Thermal imaging | 150 to 1,000 pounds | 150 to 500 pounds |
| Acoustic detection | 1,000 to 1,500 pounds | 150 to 400 pounds |
| Tracer gas | 250 to 2,000 pounds | 250 to 600 pounds |
| Underground pipe detection | Not given separately | 300 to 800 pounds, with excavation and pipe repair charged separately |
| Hourly labour and call-out | Says a quote usually includes an hourly or daily rate plus any call-out fee, with no figure | Hourly rates of 40 to 80 pounds, call-out of 60 to 120 pounds |
| Emergency or out of hours | Says these usually cost more, with no figure | 300 to 1,000 pounds or more |
| Repair after the leak is found | Main water service line 330 to 1,500 pounds, internal pipe around 330 pounds | Pipe repair 100 to 500 pounds, burst pipe 150 to 1,500 pounds or more |
Both pages say something about the basis of their figures. The directory calls its numbers ballpark averages and says its calculator figure is generated using AI from past jobs on its platform. The comparison guide says its survey figures are generally for detection alone and do not normally include major repair work, reinstatement or redecorating, and it says rates tend to be higher in London and the South East without giving a London number. Neither page states whether its detection ranges include VAT. The directory says VAT applies if the tradesperson is VAT registered and tells readers to check. The comparison guide tells readers to find out before agreeing a quote.
Why the ranges are so wide, and why they disagree

Look at the acoustic row. One guide gives 1,000 to 1,500 pounds and the other gives 150 to 400 pounds. The two ranges do not overlap, and the top of one is ten times the bottom of the other. The pages do not explain the gap, so we cannot say which is closer to what a London firm charges. What we can say is that a cost guide is a statistical summary of different things sold under one name, and that is where most of the confusion starts.
In our experience, and this is a practitioner view rather than a measured fact, several things sit behind a spread like that:
- The same label covers different amounts of work. “Acoustic” can mean a quick listen with a hand-held device at a valve, or a full survey of a buried pipe with ground microphones and a written trace report.
- A single method is rarely sold on its own. Most surveys use two or three methods in sequence, so a per-method price is often a slice of a bigger job.
- Some figures are labour only and some are a whole visit with equipment, a report and the return trip.
- A cost guide can mix a plumber who looks at visible pipework with a specialist who uses equipment, even though these are different services.
- Several guides appear to repeat the same underlying data, so two sites agreeing proves less than it seems to.
The practical conclusion is modest. Use a cost guide to tell whether a quote is in a believable region, and do not use it to decide whether a quote is fair. A fair comparison needs the quotes themselves, written on the same basis. The rest of this page is about how to get them onto the same basis.
Four shapes of leak detection price
Most prices you will meet in London fall into one of four shapes. Each tells you one number and hides others.
| Shape | The number you see | What it can hide |
|---|---|---|
| Hourly rate | A rate per hour or half hour | How many hours the job takes, any minimum, and any extras added to the hours |
| Call-out plus hourly | A fee for attending, then a rate | What the call-out covers, and whether it is charged when nothing is found |
| Fixed price for a survey | One figure for a defined scope | What the scope is, what happens if the job needs longer, and what is excluded |
| Method price list | A price for each technique | That a job often needs several techniques, so the bill is the sum of lines |
An hourly rate is not a job price, and a fixed price is not the same as a fixed hourly rate. Our page on hourly rate, fixed price and no find, no fee goes through how each one works and who carries the risk of a long job. To see how a method price list is built and why it misleads, read leak detection cost by method.
What can make a London quote different from a UK-wide range

The comparison guide says rates tend to be higher in London and the South East. It gives no figure, so we will not invent one. The reasons below are practitioner observations about running jobs in London, and none is a measured effect:
- Travel and parking. Controlled parking, congestion and low emission zone charges can be added to a quote by some firms and absorbed by others. Ask which.
- Access. A flat in a mansion block or a converted Victorian house can mean a managing agent, a key holder and a shared riser, which usually costs time on site.
- Time lost between sites. A firm that is travelling across the city may include that in its minimum charge.
- Older pipework. Mixed materials and past repairs in older London properties can make a survey take longer, though that depends entirely on the building.
If a London quote is higher than a national range, ask what is inside it before concluding that it is dear. If it is lower than every range you have seen, ask the same question. A low figure that leaves out the report, the gas or a minimum charge is not the same as a low total.
Comparing quotes like for like
When you have two or three quotes, ask each firm the same questions and write the answers in one table. The questions below are the ones that change the total most.
| Ask | Why it matters |
|---|---|
| Is the figure an hourly rate, a fixed price or a total? | An hourly rate has to be multiplied by the time. A total already contains an assumed time. |
| How many hours do you expect for my property, and what if it takes longer? | This turns a rate into the number you will actually pay. |
| Is there a minimum charge or a minimum time on site? | A one-hour minimum on a short job costs more than the rate suggests. Ours is the first hour at 100 pounds. |
| Is there a call-out fee, and is it part of the first hour or on top? | Some quotes show the rate and add attendance separately. |
| Which methods are included, and is tracer gas an extra? | Gas, a camera or a ground microphone can be separate lines at some firms. |
| Does the price include a written report, with photos, that I can send to a landlord or insurer? | A report can be included or charged on top. |
| Is there a parking, congestion or low emission zone charge? | These can be added after the quote. |
| Does the figure include VAT, or is VAT added? | A figure before VAT is lower than what you pay if the firm charges it. |
| What do I pay if the leak is not found, and where is that written? | This is the largest difference between offers and the one most often left out. |
| What is not included: access work, making good, the repair? | Detection is usually the smaller part of the cost of putting things right. |
If a firm will not answer in writing, that is information too. Our questions to ask a leak detection company page has the longer list, leak detection company red flags covers what to be wary of, and how to choose a leak detection company in London covers the other things a price does not tell you, such as the report and who stands behind the work.
Putting VAT on the same footing
The standard rate of VAT is 20 percent, according to GOV.UK (read 25 November 2026). A firm that is VAT registered and quotes before VAT will add a fifth to that figure. A firm that is not registered adds nothing. Both can be legitimate, and neither is visible from a headline number, which is why the question matters.
Advertising rules for consumer prices, in the UK Code of Non-broadcast Advertising, say that a price should include non-optional charges, and they allow tax-exclusive prices only in limited cases with a clear statement. We read that on the Advertising Standards Authority’s page on 24 November 2026. In practice, a firm that quotes you a rate plus VAT should say so next to the rate. If it does not, ask. When you compare, convert every figure to what you would hand over on the day.
No VAT charged. That is our position and it is in every figure on our pricing page. It does not make our rate cheaper or dearer than anyone else’s by itself, and you should still compare totals.
Where our rates sit
Standard leak detection is £100 for the first hour, then £150 an hour, billed in half hours after the first hour. Included in that price: tracer gas, acoustic detection, thermal imaging, an endoscopic camera inspection, a trace and access report for your insurer and a written quote for the remedial works. We call you before the survey goes past 3 hours, so you decide whether to go on. A typical 2.5 to 3 hour survey comes to £325 to £400. Mains and supply pipe detection is a fixed £450, however long the job takes. No VAT charged, and there is no parking charge. No find, no fee: if a leak is present and we do not find it, you pay nothing.
Set against the two guides above, that typical total sits inside both whole-survey ranges. Our hourly rate is higher than the hourly labour figure in the comparison guide, which is a different thing, since that figure appears to describe general trade labour and not a specialist survey with equipment. We have not been able to confirm that from the page, so do not read it as a claim. Some firms also publish lower hourly rates than ours. If the only question is the lowest rate on a page, there are firms that beat us, and our pricing method and sources page says so with dated figures.
What we can offer is a rate that is quoted before we start, tied to a list of what is in it, with no extras for gas or the report. Repairs are not in the price. They are quoted separately, in writing, after the leak is found, and you can take the report to anyone. For other firms’ published rates, with dates and a note on whether each can be compared with ours, see our two single-firm comparisons: a national trace and access firm’s prices compared and a fixed fee detection firm’s prices compared.
What none of these figures include
Almost every detection price stops when the leak has been located. What comes after is a separate cost, and it is usually larger.
- The repair itself. The guides above give separate ranges for pipe repair, and we quote ours in writing once the leak is found.
- Access and making good. If a floor, wall or ceiling has to be opened to reach the pipe, putting it back is a cost of its own.
- Drying and redecorating where water has already spread.
- Any insurance excess, where you are making a claim.
Some home insurance policies include cover to find the source of a hidden leak and to make good the access, but the wording differs. The two insurer pages we read, from Ageas and Saga, apply it where escaping water has damaged the building, and Ageas asks you to agree tracing work with it before it starts. Check your policy, and read leak detection report for an insurance claim before you book anything you hope to claim for.
What to do with the quotes you have
- Ask each firm for its price in writing, using the table above as the list of questions.
- Ask each for a total at three hours and at five hours on site, so that an hourly rate and a fixed price can be set side by side.
- Add anything the quote leaves out: call-out, parking, gas, report, VAT.
- Write down what each firm says it will charge if nothing is found, and compare that last.
- Decide with the whole picture, including the report you get and who does the repair afterwards.
Our leak detection cost estimator gives a rough figure for ours from your answers, and how long leak detection takes explains what drives the hours. If you are weighing whether to book at all, is leak detection worth it? goes through the cases. When you are ready, report a leak or call 020 3961 5444, and we confirm the rate before anyone travels. All our guides are on the guides hub.
How this comparison was made
Every figure in a comparison is dated and names its source. How we price our own work, and where the other numbers come from, is set out in how we price and source.