
Water supply pipe replacement
We survey the pipe first, then quote a replacement in writing if that is what the survey supports.
The quick version
- What it is
- Surveying a failing supply pipe, then replacing the length that needs it, by trench or trenchless method.
- What it costs
- Survey at £180/hr, typically £360 to £540. Fixed hourly rate quoted first, never exceeded. No VAT charged. The replacement is quoted separately in writing.
- What you get
- Written report with photos, then a written replacement quote listing the route, method and reinstatement.
Want it located, not guessed at? Call us
Signs you may need this
- A second leak soon after the first repair
- Several leaks along the same run
- A pipe material you want removed, such as lead
- Repeated low pressure or discoloured water
- A drive or extension planned over the old route
How we find it

Tracer gas
A harmless gas is introduced to the pipe and detected where it escapes. Finds small leaks under floors and slabs.

Pipe tracing
Locating the route of buried supply pipe so a leak can be pinpointed before anyone digs.

Endoscope
A small camera looks into voids and pipe runs that cannot be opened up yet.

Pressure test
Isolating a section of pipe and watching whether it holds pressure confirms where the loss is.
Replacing the supply pipe is worth considering when it leaks in more than one place, is made of a material you want out, or keeps failing after repairs. We survey the pipe first at £180/hr, report what we find, and send a written replacement quote. There is no replacement price list, because routes, depths and surfaces differ.
Who this is for
You own the property, or you are the landlord or managing agent, and the supply pipe from the boundary into the building is the problem. Thames Water describes that pipe as generally the property owner's responsibility, along with the plumbing inside. So the decision to repair or replace is yours, and so is the bill.
This page is about the pipe from the boundary to the building. The water company's own pipe in the street, the communication pipe, is not something you or we replace. If you are still deciding between a repair and a new pipe, read water supply pipe: repair or replace alongside this page.
When replacement makes sense
| What the survey shows | Usually points to | Why |
|---|---|---|
| One leak at a joint, the rest of the pipe in good condition | Repair | A small opening at a known point is the cheaper route and the pipe is otherwise sound |
| A second leak within a short time of the first repair | Replacement of that run | A pipe that has failed twice is telling you about its condition |
| Several leaks along one length | Replacement | Repairing each point means opening the ground repeatedly |
| A pipe material you want gone, such as lead | Replacement | This is a decision about the material, not only about a leak |
| Pipe that sits under a planned extension, drive or patio | Replacement before the build | It is cheaper to fit a new pipe before the surface goes down than after |
| Pipe cannot be traced or reached without major work | Survey first | You need the route before you can price anything honestly |
If you are unsure what your pipe is made of, water supply pipe materials in the UK and how to tell if you have a lead water pipe will help you work it out before we visit.
Why we survey before we quote a new pipe
A replacement quote written without knowing where the pipe runs is a guess, and guesses get adjusted once the digging starts. So the first step is a survey, not a price.
- We trace the route from the stop tap to the building with a locator and mark it.
- We pressure test sections we can isolate to show whether the whole run is losing water or only part of it.
- Where there is a leak, we pinpoint it with tracer gas, so the report says what is wrong and not only that something is.
- We use an inspection camera where there is an access point such as a void or chamber, to see the pipe's condition.
- We record the surfaces above the route, the likely depth and anything in the way: a tree, a drain, a retaining wall.
The survey is charged at £180/hr, quoted before we start. Typical totals are £360 to £540, a guide and not a cap, and No VAT charged. Tracer gas, when needed, adds a one-off £80 bottle charge. See the pricing page for the full table.
How a new pipe goes in
There are two broad ways to lay a new supply pipe, and which one is possible depends on what the survey finds.
| Open trench | Trenchless (moling) | |
|---|---|---|
| What happens | A trench is dug along the route and the new pipe laid in it | Small pits at each end, and a tool drives a path for the new pipe through the ground |
| Suits | Short runs, soft ground, places where the route has to be seen | Longer runs under drives, lawns and patios you want to keep |
| Limits | More surface to reinstate | Needs a clear path. Roots, old drains and rubble can stop or deflect it |
Our guide to moling vs digging compares the two in more detail. We tell you in the quote which one we expect to use and why.
Modern supply pipe is usually blue MDPE plastic. MDPE blue water pipe explained covers what it is and why it is used.
What is in the quote, and what is not
We do not publish replacement prices. The cost depends on the length, the depth, the surface, whether the pipe can be moled and what has to be put back. A short run under a lawn and a long run under a block-paved drive are different jobs, and a figure on this page would be wrong for most of you.
What you get is a written quote that lists:
- the route and length we expect to replace
- the method, open trench or trenchless, and the reason for it
- what is being supplied: pipe, fittings and connections at each end
- the reinstatement: what we put back and what is left for you
- whether the job needs notice to the water company
- what is not included, written plainly
The water regulations list some types of work that need prior notice to the water company. The version we read lists, among others, laying underground pipe shallower than 750mm or deeper than 1350mm. Regulations get amended, so we confirm the position for your job when we quote. Thames Water's page on arranging repairs also says to ask for a certificate of compliance with the water regulations once the work is done. Ask every firm quoting whether it can provide one.
Paying for it, and checking who else might
- Check your insurance first. Thames Water says some home emergency or buildings policies cover supply pipe leaks. Wording differs, and a policy that covers a leak does not always cover a planned renewal.
- Ask Thames Water if you are on its Priority Services Register, WaterHelp or WaterSure. Its code says it may help at its discretion for those customers. The pipe stays yours either way.
- If you share the pipe with neighbours, the common section is shared between the owners, and Thames Water says it does not step into disputes between them. Agree the split before the work.
- If you are a tenant, tell the landlord. Under section 11 of the Landlord and Tenant Act 1985 a landlord must keep the water supply installations in working order in the tenancies it covers.
What happens next
- Report a leak or call 020 3961 5444 and tell us what you have seen.
- We agree the survey rate and a time before we travel.
- You get the written report with photos.
- If a replacement is the sensible answer, we send a written quote. You decide after you have read both.
If the pipe is leaking right now, start with the supply pipe leak trace. It finds the leak, which may turn out to be a repair and not a replacement.
Last reviewed .
Sources
- Pipe responsibility, Thames Water
- Arranging leak repair, Thames Water
- Leakage code of practice (PDF), Thames Water
- Water Supply (Water Fittings) Regulations 1999, regulation 5 (as made), legislation.gov.uk
- Landlord and Tenant Act 1985, section 11, legislation.gov.uk
What the price covers
- Fixed hourly rate quoted first, never exceeded.
- No VAT charged.
- Tracer gas is charged at the same rate plus a one-off £80 bottle charge, only when needed.
- Written report with photos.
No find, no fee. The only extra is a tracer gas bottle, and only if gas is used.
Found the leak? We quote the repair.
Repairs are quoted in writing once the leak is located. Every fix is different, so there is no repair price list.
We are plumbers as well as leak specialists, so we can carry out the repair once you approve the quote.
Related
- Underground supply pipe leak: trace and repairFind a leak
- Leak detection pricesPrices
- Report a leakRepairs quote
We cover every London borough from one call-out area, so there is no separate page to find for your part of London.
Questions about this service
Do I have to replace the whole supply pipe?
Not always. If the survey shows one leak and sound pipe either side, a spot repair is usually the better value. We say which option the survey supports and why.
How much does a new supply pipe cost?
We do not publish a replacement price, because length, depth and surface change the job. After the survey you get a written quote. The survey itself is £180/hr.
How long does the work take?
It depends on the length, the surface and the method. We put an expected duration in the quote and tell you when the water will be off.
Do I need to tell the water company?
Only some work needs prior notice under the water regulations, and the rules can change. We confirm whether your job needs it when we quote.
Will you dig up my garden or drive?
We survey without digging. For the replacement, where moling is possible, the openings are small pits and not a continuous trench. Where it is not, we explain why in the quote.
Can I use another plumber after your survey?
Yes. The report is yours. It shows the route, the leak and the condition of the pipe, so another plumber can work from it.
Talk to someone about your leak
Hourly rate quoted first, never exceeded. Repairs quoted in writing once the leak is found.