How a survey cost is built
A survey is charged by the hour. The rate depends on the kind of work: standard detection, a mains or supply pipe trace, heating and underfloor leaks, a trace and access job with an insurer report, or emergency work outside normal hours. £100 for the first hour, then £150 an hour, quoted before we start. No VAT charged.
The total is the rate multiplied by the hours the survey takes. The typical totals in the estimator are what jobs of that kind usually come to, so they are a guide to the likely size of the bill rather than a promise about yours. Our pricing page lists every rate, and how we price and where our figures come from explains how we check them.
Tracer gas is not a separate line. When it is the right method, it is included in the price, and so is the written report.
What drives the time on site

Hours are where two surveys of the same price band part ways. These are the things that move them most.
- The route of the pipe. When nobody knows where the supply pipe runs, tracing it is most of the visit. Our guide to non-invasive leak detection shows how we work without opening floors.
- The number of possible sources. A high bill with a dripping tap, a running toilet and an old pipe has three suspects, and each takes time to clear.
- What the leak sits under. Concrete, tiles and screed slow the survey, and a buried heating loop is harder to find than exposed pipework.
- Access. A flat with pipes in a neighbour's ceiling, or a stop tap that is stuck or missing, can add time before the survey proper begins.
- Building size. The home totals in the estimator do not stretch to a block or a commercial unit, which is why those take an agreed number of hours.
If you are not sure who looks after the pipe in question, read who owns the water supply pipe and who is responsible for a water leak first. It can change who pays for the survey and who has to be told about it.
Why you get a range and not a fixed quote
Nobody can know before the visit how long a hidden leak takes to find. A fixed price for the whole job either includes a cushion for the unknown, which you pay for whether you need it or not, or it comes with exceptions you find out about later. An hourly rate that is quoted first and not exceeded keeps the bill tied to the work actually done.
The range in the estimator comes from our own published typical totals. It does not use averages from other firms, whose pricing models differ and are not like for like. For a dated comparison with sources, see leak detection prices in London compared, and hourly rate against fixed price for the arithmetic of each model.
When you are ready, report a leak or call 020 3961 5444. We confirm the rate on the call before anyone travels, and the survey rate is not exceeded for the survey time we agree.
What the survey rate includes

The hourly rate covers the engineer's time on site using non-invasive methods. Depending on the job that means thermal imaging, moisture mapping, tracing the pipe and, where it is needed, tracer gas. You receive a written report with photos, and there is no VAT to add.
It does not cover repairs or making good after access work. Those are separate and are quoted in writing before anything goes ahead. If you are making an insurance claim, read leak detection reports for insurance claims before you book, because some insurers want to agree tracing work first.


